The Board / Schools, civic and institutions / site
Cookie Society
2040 N. International Pkwy Terminal B19, Dfw Airport, TX 75261 · Tarrant County
Owner-estimated cost$450KWhat the owner told the state it will cost to build. Not a sale.
Type of workRenovation/Alteration450 sq ft
Estimated start2026-10-30
in 11 days · the owner's estimate
Registered2026-08-17TABS2026028015
Who to call
Owner
DFW Airport
Architect / design firm
Hohe Design Group
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
Renovations to an existing A-2 occupancy building. Scope of work includes interior and exterior finishes as well as upgraded electrical, mechanical and plumbing systems.
What a job like this buys
- Site work and paving
- Structural concrete and rebar
- Structural steel
- MEP subcontracts (plumbing, electrical, HVAC)
- Masonry
- Roofing
- Doors, frames and hardware
- Metal studs and drywall
- Flooring
- Low-voltage, security and data
- Fire protection
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Payment and performance bonds
Typical categories for schools, civic and institutions work, not a prediction about this site.