The Board / Schools, civic and institutions / site
DFW - TC Ph. 2.1/2.2 Enabling Package - Concessions Storage
2330 N International Pkwy, Dfw Airport, TX 75261 · Tarrant County
Owner-estimated cost$100KWhat the owner told the state it will cost to build. Not a sale.
Type of workRenovation/Alteration2,206 sq ft
Estimated start2026-10-01
18 days ago · the owner's estimate
Registered2026-08-18TABS2026028131
Who to call
Owner
City of Dallas/DFW Airport Division
Architect / design firm
Corgan Associates Inc.
Tenant
Audie Harris
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
Reconfiguration of existing space to accommodate new tenants. Total scope includes storage. Total Area: Approximately 2,206 SF
What a job like this buys
- Site work and paving
- Structural concrete and rebar
- Structural steel
- MEP subcontracts (plumbing, electrical, HVAC)
- Masonry
- Roofing
- Doors, frames and hardware
- Metal studs and drywall
- Flooring
- Low-voltage, security and data
- Fire protection
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Payment and performance bonds
Typical categories for schools, civic and institutions work, not a prediction about this site.