The Board / Schools, civic and institutions / site
Tarleton State Parkway Overpass at Chisholm Trail Parkway Entrance & Exit Ramps
Tarleton State Parkway, Fort Worth, TX 76123 · Tarrant County
Owner-estimated cost$382KWhat the owner told the state it will cost to build. Not a sale.
Type of workNew Construction31,231 sq ft
Estimated start2026-12-14
in 56 days · the owner's estimate
Registered2026-08-19TABS2026028287
Who to call
Owner
North Texas Tollway Authority (NTTA)
Architect / design firm
GFT Infrastructure, Inc.
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
Work consisting of grading, bridge structure, sidewalks (31,231 sf), exit and entrance ramps, toll gantry facilities, drainage, signing, striping, illumination, ITS, TCP, removals, utilities, and environmental.
What a job like this buys
- Site work and paving
- Structural concrete and rebar
- Structural steel
- MEP subcontracts (plumbing, electrical, HVAC)
- Masonry
- Roofing
- Doors, frames and hardware
- Metal studs and drywall
- Flooring
- Low-voltage, security and data
- Fire protection
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Payment and performance bonds
Typical categories for schools, civic and institutions work, not a prediction about this site.