The Board / Schools, civic and institutions / site
Brays Bayou Greenway Replacement Trail
5503 1/2 Livorno (Pvt) way, Houston, TX 77021 · Harris County
Owner-estimated cost$2.6MWhat the owner told the state it will cost to build. Not a sale.
Type of workRenovation/Alteration116,000 sq ft
Estimated start2026-10-01
17 days ago · the owner's estimate
Registered2026-08-20TABS2026028302
Who to call
Owner
Houston Parks Board
Architect / design firm
Halff
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
10-ft wide Concrete trail (116,000sf) replacing existing 8-ft wide asphalt
What a job like this buys
- Site work and paving
- Structural concrete and rebar
- Structural steel
- MEP subcontracts (plumbing, electrical, HVAC)
- Masonry
- Roofing
- Doors, frames and hardware
- Metal studs and drywall
- Flooring
- Low-voltage, security and data
- Fire protection
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Payment and performance bonds
Typical categories for schools, civic and institutions work, not a prediction about this site.