The Board / Industrial and warehouses / site
219013 Austin Electric Vehicle Charging
301 1/2 N Lamar Blvd, Austin, TX 78703 · Travis County
Owner-estimated cost$600KWhat the owner told the state it will cost to build. Not a sale.
Type of workNew Construction11,380 sq ft
Estimated start2026-11-15
in 28 days · the owner's estimate
Registered2026-09-10TABS2027000707
Who to call
Owner
Lorenz Perry
Architect / design firm
Westwood Professional Services, Inc.
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
Adding 16 EV chargers and electrical equipment to an existing surface parking lot
What a job like this buys
- Site work and paving
- Structural concrete and rebar (slab and tilt-wall)
- Pre-engineered metal building or structural steel
- Roofing
- Overhead and dock doors
- Electrical and lighting
- Fire sprinklers
- HVAC
- Racking
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Insurance and bonding
Typical categories for industrial and warehouses work, not a prediction about this site.