The Board / Schools, civic and institutions / site
DFW American Terminal C Ph2-3 Fit-Out
2040 North International Parkway, Dfw Airport, TX 75261 · Tarrant County
Owner-estimated cost$100.0MWhat the owner told the state it will cost to build. Not a sale.
Type of workRenovation/Alteration850,000 sq ft
Estimated start2027-03-01
in 134 days · the owner's estimate
Registered2026-09-10TABS2027000738
Who to call
Owner
DFW Airport
Architect / design firm
Corgan Associates, Inc.
Tenant
Audie Harris
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
Interior fit out for baggage claim, security check point, concessions white boxes, offices, restroom, break rooms, BOH, ready rooms, and gate hold lounges at Terminal C. (850,000 SF)
What a job like this buys
- Site work and paving
- Structural concrete and rebar
- Structural steel
- MEP subcontracts (plumbing, electrical, HVAC)
- Masonry
- Roofing
- Doors, frames and hardware
- Metal studs and drywall
- Flooring
- Low-voltage, security and data
- Fire protection
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Payment and performance bonds
Typical categories for schools, civic and institutions work, not a prediction about this site.