The Board / Schools, civic and institutions / site
Duck Creek to Audubon Trail Connection
Audubon Park, Garland, TX 75043 · Dallas County
Owner-estimated cost$1.7MWhat the owner told the state it will cost to build. Not a sale.
Type of workNew Construction16,000 sq ft
Estimated start2026-11-02
in 14 days · the owner's estimate
Registered2026-09-16TABS2027001219
Who to call
Owner
City of Garland
Architect / design firm
Halff
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
12-foot Wide Concrete Shared Use Path with 120-foot Long Pedestrian Bridge
What a job like this buys
- Site work and paving
- Structural concrete and rebar
- Structural steel
- MEP subcontracts (plumbing, electrical, HVAC)
- Masonry
- Roofing
- Doors, frames and hardware
- Metal studs and drywall
- Flooring
- Low-voltage, security and data
- Fire protection
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Payment and performance bonds
Typical categories for schools, civic and institutions work, not a prediction about this site.