The Board / Hospitals and medical / site
MHWT Cath Lab 14 Replacement
6551 Bertner Ave, Level 04, Houston, TX 77030 · Harris County
Owner-estimated cost$650KWhat the owner told the state it will cost to build. Not a sale.
Type of workRenovation/Alteration1,100 sq ft
Estimated start2027-01-04
in 78 days · the owner's estimate
Registered2026-10-08TABS2027003050
Who to call
Owner
Houston Methodist Hospital - TMC (Walter Tower)
Architect / design firm
THR3E Design
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
The scope includes the renovation of an existing 1,100 SF Cath Lab to replacement of existing medical equipment, with no changes to interior or exterior walls.
What a job like this buys
- MEP subcontracts (plumbing, electrical, HVAC)
- Medical gas and specialty plumbing
- Metal studs and drywall
- Ceilings
- Doors, frames and hardware
- Sheet vinyl and specialty flooring
- Casework
- Fire protection
- Low-voltage, nurse call and data
- Infection-control barriers and cleaning
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Insurance and bonding
Typical categories for hospitals and medical work, not a prediction about this site.