The Board / Schools, civic and institutions / site
East McKinney Drainage Study and Improvements
McMakin St. and Finch Ave, Mckinney, TX 75069 · Collin County
Owner-estimated cost$4.5MWhat the owner told the state it will cost to build. Not a sale.
Type of workNew Construction8,650 sq ft
Estimated start2027-05-01
in 195 days · the owner's estimate
Registered2026-10-13TABS2027003426
Who to call
Owner
City of McKinney
Architect / design firm
Pape Dawson
Phone numbers for the owner, architect and tenant come with an account.
Start free trial →
Start free trial →
The registry doesn't name the general contractor. The owner or architect can tell you who is building it and who is buying.
Scope, as registered
Construction of roadway, pedestrian and drainage improvements along McMakin St from McDonald St to Fowler St and Finch Ave from Hunt St. to Greenwood Rd. Sidewalk improvements. Approximately 8650 sf
What a job like this buys
- Site work and paving
- Structural concrete and rebar
- Structural steel
- MEP subcontracts (plumbing, electrical, HVAC)
- Masonry
- Roofing
- Doors, frames and hardware
- Metal studs and drywall
- Flooring
- Low-voltage, security and data
- Fire protection
- Jobsite services (dumpsters, restrooms, temporary fence)
- Equipment rental
- Payment and performance bonds
Typical categories for schools, civic and institutions work, not a prediction about this site.