The Book / Builders and GCs / contractor dossier
DU-WEST
Named on 17 permits the City of Sugar Land issued from 2025-10 through 2026-09, up 83% on the half-year before. 1 more so far this month.
Permits per month
10/25
11/25
12/25
01/26
02/26
03/26
04/26
05/26
06/26
07/26
08/26
09/26
10/26
The math, labelled as arithmetic
Pace
1.8permits a month — 11 over the last six full months, divided by six.
A year at this pace
22permits, if the last six months held. Arithmetic, not a forecast.
Half-year before
6permits, 2025-10 to 2026-03.
No dollar figure
Sugar Land puts a usable job value on too few permits to total one honestly, so this page counts jobs, not dollars.
Peers — similar volume, same trade
SIGN CITY18 PULTE HOMES16 AAA FOUNDATION15 EZZI SIGNS, INC14 SIGNS BY G14 STRUCTURED FOUNDATION REPAIRS14Outreach kit — three touches, written from the record
Every fact in them is on this page. Edit before sending.
An email, a call opener and a follow-up for DU-WEST
Written from its own permit record, with your company's name in them, ready to copy.
Start free trial →
Start free trial →
Its permits, newest first
The ones Bidro holds for this company — the most recent months.
Its permits, address by addressIncluded with an account.